Jump to content
 

Green Leaf Brewery London


Aldgate Box Boy
 Share

Recommended Posts

  • 4 weeks later...
  • 2 weeks later...
  • 2 weeks later...

Hi everyone, well this is the beginning of Green Leaf#2. I finally got around to putting the last pair of legs onto the 4th baseboard.  These are images of the four boards connected up for the first time in my messy study - or should I call it train room!

I've wired up all the boards with two bus bars - one for track the other for points.

More soon.

Cheers TimIMG_2381.JPG.f4532b07a8ce84f1bc05f5ed84ad6ac9.JPGIMG_2382.JPG.eb1586536a6e97c90c576ba8c5ea6f11.JPGIMG_2383.JPG.6ae4603d7f416c98dc655e69b0556389.JPGIMG_2384.JPG.8dc7776f4c549fd9e57f76705d69d2af.JPG 

  • Like 7
Link to post
Share on other sites

  • 1 month later...
  • 2 weeks later...

Hi All, more progress on the track laying. The dual gauge section is enjoyable and slow. The Butanone adhesive didn't seem that effective so I went for superglue, which seems to work well.
the first picture shows the two dual gauge lines. One on the left is the power station road. The R/H is the through road.
Second picture shows the Power station in place. Just at the end of the through road is where the gauges will split with a narrow gauge section and a simple standard gauge siding for the engineering shops.
The final picture looks back up the line.
Cheers Tim

 

 

IMG_2413.JPG

IMG_2414.JPG

IMG_2415.JPG

  • Like 5
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...