Jump to content
 

Bachmann work in progress update - Sept 12


Graham_Muz

Recommended Posts

  • RMweb Gold

Bachmann have advised the following information about work in progress as of September 2012

 

With the development teams in rediness for passing to Drawing Office:

Class 101

LNER 10T Fish Van

Southern Railway PLV / PMV / CCT

10t Utility Van

Ivatt 2MT 2-6-2T DCC chassis upgrade

Class 158

 

In the Drawing Office:

COVHOP

LNER J11 0-6-0

L & Y 1008 class 2-4-2T

Midland 20T brake van

PCA Metalair Powder Tank Wagons

 

In the Tool Room:

3200 Earl Class

LMS Porthole Coaches

10001/10001 Diesel Locomotives

Polybulk

 

EP sample stage:

Midland Railway 4F 0-6-0

Class 40

LMS Porthole Coaches (due soon)

 

Artwork Stage:

S&DJR Blue Jinty

Mark 1 Sleeper Car

 

Livery Stage:

Class 47 (crew cut versions)

Class 205 Thumper (For Kernow Model Centre)

Midland Railway Compound 4-4-0

GWR Modified Hall (DCC Chassis upgrade)

 

Approved for Production:

SECR/SR C Class 0-6-0

Midland Pullman

LNER D11/2 Scottish Director 4-4-0

LNER D11/1 Director (NRM)

 

On way to UK:

Mark 1 Horsebox (TMC)

SR 25t 'Pill box' brake van

Link to post
Share on other sites

Thanks very much for that list Graham.

I know model manufacturers are not obliged to provide any of that kind of information, but it is very interesting, and kind of allows a kind of metaphorical glimse through the factory doors. In turn reinforces my personal choice of fave model manufacturer.

Link to post
Share on other sites

  • RMweb Gold

I attended, on behalf of Andy Y and therefore the forum, the Bachmann summer annoucement event at the Great Central Railway last Sunday, hence all the new annoucement topics that I started Sunday evening.

Link to post
Share on other sites

I attended, on behalf of Andy Y and therefore the forum, the Bachmann summer annoucement event at the Great Central Railway last Sunday, hence all the new annoucement topics that I started Sunday evening.

 

Which I'm very appreciative of as I was unable to make it to the event with holiday commitments (first one I've missed over recent years). I honestly didn't want Muz having to do mountains of work but I'm very appreciative that he did put himself out and relay the info as soon as possible rather than waiting for me to be behind the desk on Monday.

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.


×
×
  • Create New...