I Remember when the slabs for Dalzell were taken whilst still warm from Ravenscraig, put on to the back of a truck, driven across the waste ground separating the two plants, and taken whilst still warm into the Plate mill....
by the late 80’s, British Steel management, to. Try and make the Ravenscraig works look less profitable, insisted that the slabs for Dalzell were loaded onto trains, taken down to South Wales, or Teesside, then sent back to Dalzell.... they tried every accounting trick in the book to try and make Ravenscraig appear unprofitable.... despite their attempts, Ravenscraig was still recognised as the most efficient single blast furnace plant in the world....