Well, opened it up shut it, read a bit of the guides, watched the vid's, opened it up again and shut... had a cuppa...
Opened it again and fired this out.
So an A5 with 160 inch track centres, I though it would be a good idea to add the extra two feet between tracks, as it's a terminus station, to give that extra room for staff to work safely (is that too much or not enough).
Think I'm going to build this in copperclad as a warm up (and I've never built a complete copperclad point before).
One thing does puzzle me, is how does one get the rail at 1:20, having used plastic chairs this inclination is already set in them but with just bullhead and copper how can this be done?
Oh, instead of using boxes I found these mock-up buildings I'd made years ago using plans stolen from the tinterweb from this fantastic site (I reversed the drawings does that negate copyright?)
Cheers
Dubya