This Sunday is one not to be missed at Ruddington Model Railway. As part of the layout rewire testing, the layout this Sunday will operate under DCC control for the first time. It is hoped to have a good array of locomotives running including some sound fitted examples so listen out for them toots and whistles.
During our winter shut down period, the layouts rewire will be completed removing annoying power drops, excess wiring and cutting down power consumption but will most importantly enable the layout to be easily switched between DC and DCC control catering for all the interests of our current and prospective members. Along with the remodelling of the fiddle yard area to create two dedicated "run through" lines, the layout will re-emerge early 2016 running efficiently and effectively for many years to come.