Jump to content
 

LongRail

Members
  • Posts

    1,100
  • Joined

  • Last visited

Everything posted by LongRail

  1. Swapped the XR3i wheels from a basic set with hub cabs from a mk3 Cortina GT, decided to customise the cortina with spare parts from the XR3i, used photos from google for the interior colours
  2. Bernard, thanks I had spotted the difference on the tail lights which are a lot narrower thanks for the mark up i will see what I can do to the tailgate without having to start over again
  3. In the process of producing a BR Escort Mk 4 Combi Van in 1/76 scale using 2 escort XR3i donor models, will swap the wheels with a Cortina model I have as these are clearly XR3i wheels which it would not have had fitted.
  4. A good friend of mine has purchased an ex BR Escort Mk 4 Combi Van to restore to its former glory, I thought I would have a go at recreating it in 1/76 scale using 2 escort XR3i donor models, will swap the wheels with a Cortina model I have as these are clearly XR3i wheels which it would not have had fitted
  5. Have completed my model of Test Coach 10, contacted Dave Bower who wrote "Rail Vehicle Testing" for assistance with the interior. Bit of modelling license required for the instrument racks however. The donor model was an Oxford Rail Mk3a with the window frames sanded down.
  6. This layout will draw enough attention due to its enormity and level of detail without using "female operators that don’t fit in with the usual norm." but i like your style
  7. Thanks for the update looking forward to receiving them
  8. When are you expecting the new versions I have some on pre order
  9. Photos of g-scale pop train are especially useful as they clarify the colours of various items
  10. Paul that’s all sounding a Olof more positive than some earlier posts, congratulations on getting married
  11. There is no standard spacing as the lighting design will take into account height of columns output of lamps along with classification of station which have different lux level requirements
  12. Great photo of Tyneside Central freight depot Class 08 shunting Aug 85 J8362.jpg which shows the remains of an old siding which has been taken out with the check rail and the long bearers left in place
  13. I received an official letter from the liquidators and in it there is a statement regarding tooling and the fact that the company was in dispute with the suppliers in China and Hong Kong. There was also a deposit paid to a supplier although it implies this may be difficult to recover The liquidators costs are currently estimated at £33,666 plus £2,000 disbursements although these are not fixed and the solicitors costs are unknown at this stage seems the only winners will be the liquidators and the solicitors
  14. Had some communication from CG Recovery Limited suggesting that I contact my bank regarding a refund They also say The Company is not in a position to provide a refund.
  15. Smaller buildings will make it easier. If you can lower the ply and use polystyrene or something similar on top it will make it easier to set the buildings on a level footing
  16. Jim the 4th picture highlights the issue with the sloping area the buildings need to be vertical not sure you will be able to modify the buildings with such a steep gradient. May be better to have building level with a road down at one end
  17. Graeme have download the price list from the Facebook group and have sent an email re an order
  18. Graeme, I have a few RTI cabs I purchased in the past and am looking a few more when will the website be up and running so that I can place an order
  19. The club set up a just giving webpage to raise £500 to cover costs and have so far raised £43k
  20. Dave never noticed before but I see you have the correct backscene overlooking the station did you make it yourself
  21. White and yellow how can you tell
  22. Hornby already have a Good quality DVT
  23. Very nice model think you may have intended to,post on the “railway motors “ forum
  24. This video from Network Rail shows Balcombe Tunnel Junction being relaid on the Brighton Main line during a 9 day blockade. This should provide a useful insight for anyone modelling current day. https://fast.wistia.net/embed/iframe/gl6bg4w2xt
×
×
  • Create New...