Jump to content
RMweb
 

pete_mcfarlane

Members
  • Posts

    4,064
  • Joined

  • Last visited

Everything posted by pete_mcfarlane

  1. Are those military ambulances loaded on to warflats in the background?
  2. They could rebuild the Doric Arch whilst they are at it.
  3. Thanks - they're still useful, despite the phone quality. Especially the shots of the underframe gear. So far I've been tweaking the trailer coach to match the photos. I'd got the door stops in the wrong place, so these were removed and new ones fitted (and the Inkscape drawings updated). The biggest surprise was the missing corridor connection at the end towards the driving trailer. I'd assumed that these had been left in situ, but it looks as though the connector was mostly removed, but the fixed parts left in situ so that it could be reinstated. So the Comet casting I fitted has been carefully removed, and I'll need to do some scratchbuilding.
  4. I ask, because I've got a Branchlines kit with a similar roof and I've not tackled one of those before. Any gotchas with them, or is it just a case of bending round suitable tubes and then applying a spot of solder on the inside to keep it in shape?
  5. I find this thread mildly annoying, because you can build etched kits a lot faster than I can manage....... Are the roofs on those Bill Bedford coaches half etched on the inside to help you bend them?
  6. The ability to make banana shaped sides might actually be useful. Those short wheelbase LNER cattle wagons for example, which ended up decided bowed looking.
  7. Thanks, those are extremely useful. My next step is going to be comparing your dimensions against my Inkscape drawing and seeing how good my guesswork is. My drivers offside door is wrong for starters......
  8. There were quite a few 'deliberate' mixed livery Souther express EMU units - mainly those with Pullman cars. Some of the late 1930s buffet units also had their buffet cars painted in Malachite green, with the rest of the set in the darker Olive green. There's also the 8-VAB with it's blue and grey buffet car in an otherwise blue set http://www.flickr.com/photos/12a_kingmoor_klickr/6281025709 As diesels, there were various weird formations involving Hastings vehicles in the late 1970s and early 1980s. Here's a tadpole with a mix of blue and blue and grey vehicles http://www.southernelectric.org.uk/sales/img/foxley0079_1202.jpg. Not all the Tadpoles had blue/grey motor coaches - some of them got reformed in to blue/grey Hastings sets whilst still in Blue. And for bizarreness you can't beat this BR Green/Connex combination: http://www.hastingsdiesels.co.uk/news/articles/2003a03/
  9. Dave, That's extremely useful and answers a couple of questions! For starters I was wondering what type of ventilators these units had - the answer in this case is several. It also looks as though the driving trailer still has the same equipment boxes on the end as it had in its EMU days. It's be interested in any more information you've got, especially the measurements of the motor coach - this is the current state of the motor coach drawings and there's a fair amount of guesswork in there.
  10. Colin, That's quite interesting - so adding the strengthening partitions (to stop distortion) actually causes some of the distortion in the first place. Some food for thought there.
  11. I'd not thought of using cyano on plasticard joints (although I've been happily using it to fix brass/whitemetal bits to scratchbuilt plasticard models for years). I'll have an experiment with it. I also suspect the distortion woul dbe less of a problem with a compartment coach compared to these open saloons - the toilet area shows no sign of distortion because it's better braced. I did pre-curve the roof, using the Geoff Kent method of rubbing it on the back with a curver scalpel handle. I'm wondering if cyano might be a better solution for the roof as well, it would avoid nay distortions (and be a lot quicker). Something else to experiment with,
  12. I'm rather enjoying this coach building. Here's the latest update. The trailer second is now on it's bogies. The ends have been fitted with steps and pre-drilled for handrails/filler pipes and glued on. The roof has the first 10thou wrapper on, and is wrapped in masking tape whilst the solvent dries. One thing I did spot was that the sides have bowed inwards slightly. I've designed the thing with an inner false roof, which pushes them back out again to the correct shape. So far this is the only distortion I've had.
  13. That's the premise behind Nigel Kneale's extremely scary TV play 'The stone tape'. Which is well worth a watch.
  14. A rummage through the boxes of bits has turned up most of the parts I need to finish this coach. First of all were a couple of sets of MJT compensated bogies, one of which has been soldered together tonight. The wheels are from the same people as Black Beetle motor bogies, and also were found in one of my boxes. I also found some DC Kits BR2 single bolster bogie sideframes - I'm still undecided about whether to use these as they're a bit crude. I did use them on my DC Kits 2-EPB, but comparing them with photos of the real things shows how much work is needed to bring them up to spec. They're also 1mm too long in the wheelbase, and I don't have enough to do the driving trailer as well. Some more thought is needed - it's a shame Bachmannn don't sell their ones as spares. I've also made a start on the motor coach drawings. This is the current state of progress. I've got two drawings to base this on - the BR weight diagram showing the 'corridor' side, and the one in the Cheona book of DMU drawings. I started by tracing the latter in Inkscape, as I did with the trailer, but ended up moving almost every element of the motor end around until it looked right. I'm increasingly thinking that the drawing was based on photos and a few known dimensions. And not very good photos either - for example the short frame motor coach had two part handrails to the driver and guard doors, the drawing shows one part handrails as per the long frame units. The group of four grills on the motor coach has rounded bottoms to the lower grills when the real thing doesn't and so on. I got this far last night, and the next step is to draw it our (using a pen in the Silhouette) to check that it looks OK. Talking of photos, I've only got a few of my own photos of the preserved Hastings, so I've been making use of lots of photos off www.preservedthumpers.co.uk. Well worth a visit. This is one of my handful of photos of a real Hastings, taken when it visited Nottingham in 2009. I've also got a few of the motor coach roof that should come in handy later on.
  15. There's a flooded qurry in Northern Ireland that's full of asbestos contaminated Irish Rail and NIR DMU vehicles. That's definitely one to give future archeologists headaches - why did 20th Century man offer so many of his metal transport machines as an offering to the water gods?
  16. MTK did them, and either the 507 or 508 was available from NNK after they took over the range. Whether it (or any of the other NNK kits) will ever appear agian is a good question. After several years the new owners have only reissued a few bits. I'm sure a modern specification class 313 kit was anounced on the forum a few years back, but I've not herd anything for ages.
  17. A quick update to show that the ends have been assembled, and a roof former made along the lines suggested by Geoff Kent in the latest MRJ. These are now hardening overnight. The ends were cut from 20 thou plasticard. As everyone else has found out already, the Silhouette won't cut through this completely, so I ended up having to go over the cuts again with a scalpel. There are two sets of ends here, including a driving end that's in the process of having it's windows added (and hasn't been separated from the surrounding plasticard yet).
  18. Apparently Labour are going to delay the HS2 Bill so they can kill it off if they win the next election. At least that's what the Telegraph are saying, as proof they've got a couple of quotes from Ed Balls saying that it might take longer than originally planned to get the bill through Parliament. Which suggests that our journalist chums are still struggling desperately to find non-existent holes in the political consensus around HS2.
  19. Both are 4mm on OO gauge track. I'm impressed that you think they are larger.
  20. If you are really daft, like me, you can cut an E2 in to three bits and stretch it to the correct length. If I rememember rightly the Hornby version is 2mm short in the boiler/tanks, and 2mm short in the bunker. The footplate also needs adjusting, as Hornby made the drop at end end too big. the basic mouldings are very nice, with all sorts of separate detail. It's just a shame they bodged it on to their existing chassis.
  21. This is the the laminated roof after a week or two of hardening. I've no doubt that another go with a more robust base to the roof would work and not go banana shaped, but having read the latest MRJ I think I'll have a go at Geoff Kent's method of wrapping a couple of layers of 10 thou round plasticard formers. This should be quicker and lest costly. I'm still experimenting with the Silhouette and various drawing tools. I've parked the SECR coach for now whilst I try out these techniques on something simpler. I had a go scanning in a drawing of a suitably simple vehicle and then tracing it in Inkscape. There was a steep learning curve whilst I got to grips with this - it took a couple of evenings of fighting the software but the result is a set of sides for a 57' Hastings/Tadpole trailer third.These were cut in 10 thou, and the inner sides in 15 thou. I'm struggling a little with some odd problems with Inkscape and/or the printer driver. As you can see, the lower side (cut from a separate sheet) is slightly shorter. it's probably only 1% different, which is still a bit odd and I'm yet to work out why. So it took a few attempts to get an accurate set of sides. These were then assembled in to a basic coach body. This started out as an experiment, but tonight I started drawing up the end and roof components with a view to finishing the coach and then doing the motor coach and providing a suitable EPB driving trailer. I've been after one of these units since 1987 when I got a copy of the Brian Haresnape BR Fleet survey book on DEMUs and 2nd generation DMUs. The only real challenge was the drawings - I tried using one from the Cheona book of DMU drawings, but it needed a lot of tweaking before it looked right. Luckily it's easy to do this in the drawing software, but I get the impression these drawings have been done from a few known dimensions and photos (for example the windows looked too small, the bogies are wrong on the motor coach, and the plan view has the vehicles too wide as I suspect the draftsman confused width over body with overall width over the door furniture). Remind me not to try using the EMU drawings from the same source.
  22. It's got a vanity plate, which (assuming it's the original reg) suggests that the armour was to enhance the egos of those inside rather than to actually stop bullets. If I was worried about being shot at/kidnapped, I'd want my car to be as inconspicuous as possible. (I checked the plate because I wondered if had a NI registration number).
  23. I had a bit of a strange problem tonight. I printed the same set of sides out twice from Inkscape (using the Silhouette printer driver), once n 15 thou and then again on 10 thou immediately afterwards. For some reason I've not fathomed, the 10 thou sides are 2mm too short. .I didn't have time to investigate further. Has anyone else seen this?
  24. They'd also have to knock down the modern art gallery which is built on the site of Weekday Cross junction. Which wouldn't be a bad thing, as it's hideous. The idea of reopening the Great Central instead of building HS2 sounds like the anti-HS2 brigade clutching at straws. Yet again.
  25. And the wonderful thing is that it also puts the costs up. So having originally complained about the envrionmental impact, the various anti-HS2 pressure groups can then move on complaining about the 'snowballing costs' and the extra traffic disruption caused by the solution to the first issue.
×
×
  • Create New...