Seeing as this is pretty much a "clean sheet" design from the various manufacturers, has any decision on couplers been made yet? Here is an ideal situation for them to produce something that is small, discrete and works well. Hopefully we dont get abominations like the Arnold N gauge coupler or slightly smaller tension locks.
Hi, not sure if its just me but I have an issue when I click on the next page button.
The following page will load at the top, but then jumps down to the last post at the bottom, meaning I have to scroll back to the top again.
Thanks.
Wow, sounds like a right xxxx storm and a hosting company staffed by muppets. No wonder it was so much work to migrate. Many thanks for your work and getting there in the end. 👍
Do you have any recourse against Dediserve for failure to deliver service and loss of data?
FOS Kits and Bar Mills have a few small buildings in their inventory that might be suitable. Small and mimimal, but still big enough to provide a purpose for the railway to be there.
https://barmillsmodels.com/product/rea-depot-at-cranberry-yard-ho/
https://barmillsmodels.com/product/springfield-stations/
https://fosscalemodels.com/collections/ho-scale-kits/products/yard-office-three-ho-scale-kit
https://fosscalemodels.com/collections/ho-scale-kits/products/tower-two-ho-scale-kit
If you dont like wooden kits and prefer a plastic one, the Woodland Scenics depot kits might work.
https://railsofsheffield.com/products/woodland-scenics-wd239-flag-depot-hooo?_pos=19&_sid=a0de7ebb6&_ss=r
I am surprised the server hosts havent been booted out in favour of a provider that can adequately support the site. Or at least been threatened that is what is going to happen.
Superb work SImon and congratualtions on a successful first outing. Seeing all those flight cases brought back happy memories of an earlier life and knowing how much I spent on mine 15 years ago, I know there is an impressive investment there. Looking forward to this coming "dahn sarf".
I dont know how I missed this thread, but delighted to find it and spend a very pleasant couple of hours reading through. I love how the classic simplicity of the track plan is contrasted by the impeccable and flawless scenery that surrounds it. An absolute work of art. Thank you for sharing with us.
There is a building going up near here that is primarily OSB and polystyrene., I did spot a few bits of 4 x 2 as well. Hardly robust materials. Maybe they will skim it with bricks, but that means they are cosmetic rather than scructural.
Was good until about 19.04 this evening. Then about 30 seconds for a new page to load (blank page), but it only partly loads. (Image is pale with a "loading" box at the bottom of the page) for another 40 seconds or so. Then I got this error message.