-
Posts
297 -
Joined
-
Last visited
Content Type
Profiles
Forums
Blogs
Gallery
Events
Exhibition Layout Details
Store
Everything posted by Scooby71
-
Hi, yes they are the lamps. I have modified them a little by extending the pole, using biro pen tube. I also painted them, which I think makes an improvement. Cheers Shaun.
-
A few extra details added to the new signal with a ladder and phone. All wired up now to the control panel.
-
Drabford new signals - Shunt signal for station kick back siding, fitted and fully wired to switch on panel. Running line Station approach signal with theatre box for platform 1 still under construction.
-
11.1.23 Final paint colour added and glazing with curtains to finish this building off. Cheers Shaun.
-
“Drabford Inn” pub construction progress pictures. I started this on 2.11.22 and finally got round to finishing it tonight. 8.11.22 7.1.23 8.1.23
-
Hi , yes I get what you say about the light should be dim in the box, I did put some black paint on the “led” it was much brighter when I first installed it.
-
- 446 replies
-
- 11
-
Because of the recent changes with the extension and the new running line, the kick back siding needs to be protected from runaway vehicles, so a catch point has been installed and is wired to work in situ with the exit point. Here’s before and after pictures. Soon I will be installing a colour light signal for the running line, which is currently under construction. Also a new ground signal for the kick back siding. Cheers Shaun.
- 446 replies
-
- 16
-
The new siding all finished now with the track weathered. A few vehicles in the BR staff car park and 08173 ticks over in the siding. Cheers Shaun.
- 446 replies
-
- 19
-
Track ballasted and buffer stop fitted with light. Also barrier added to car park. Ballast will be weathered when the PVA mix has dried. Cheers Shaun.
- 446 replies
-
- 15
-
With some spare time over the Christmas holidays I thought I’d make a few alterations. Since extending the layout, a siding was lost and is now a running line, so I decided to add a new siding for the station pilot loco. Here is a before alterations picture. The new siding on the car park area will be useful for an 03 or 08 to stable between shunting duties. The front scenery has been removed to allow for more car parking spaces.
-
Painting, adding the mortar, and weathering. In its position on the new extension board, and still under construction the “Plaza” cinema building to complete the alleyway. Cheers Shaun.
-
-
I have been working on the Victorian factory building which has been converted to a nightclub for a few weeks now, this all started since acquiring the Express Models “Strip Show” sign. Where am I going to put this I thought ? It’s got to be down a alleyway, so that’s where this scene in the corner began.
-
-
Definitely was worth the effort, with the 5 track traverser on the extension, it gives so much more stock variety to the layout and makes operating more interesting. Thanks Shaun.
-
Layout ran well all weekend and I would like to thank the Nottingham Model Rail Society for inviting Drabford. Also everyone that helped out . Cheers Shaun.
-
-
-
- 446 replies
-
- 11
-
-
Victorian factory building nearly completed, using Slater’s plasticard. And more progress with the “Drabford Inn” pub. Next is the “Plaza” cinema building. I’ve changed the design of this several times. This was originally planned to go in the corner where the Victorian factory is now, but a few new ideas on the frontage design meant it being moved.
-
A round to it, I finally got round to doing the starter signal for the platform that was added around May time. I have used the “Berko” square head signals. Cheers Shaun.
- 446 replies
-
- 10
-
-
- 446 replies
-
- 15