Jump to content

For the use of SWAG modular layout contributors

Stubby47

Stubby47's 2013 Corner Module

Recommended Posts

Interesting idea. The plot thickens! RMweb is becoming a regular hall of mirrors :-)

  • Like 2

Share this post


Link to post
Share on other sites
 

Ballasting now complete, rails painted, old over bridge built, water tower painted, signal box distressed, but still lots to do.

  • Like 2

Share this post


Link to post
Share on other sites

The 'box does have the necessary flying outhouse, without a door, but the inside will not be seen from normal viewpoints.

 

The water feature does not have a fountain, but may have a surfer, in tribute to a previous version...

Share this post


Link to post
Share on other sites

A 4mm CK perhaps, in tribute to his maritime monicker??

You'll have to model me only from photos, I'm not posing for any artiste...!  :P

Share this post


Link to post
Share on other sites

From the left :

Tunnel lining added, upper wing wall added, basic card lattice for terrain complete

Overbridge supports added

Main canal bridge pieces in place, on both sides, one curved wing wall added

Footings and front path added for cottages

Sub base for water tower added

Sub base for factory added

Sub base for signal box added

Basic terrain formers added at front right.

  • Like 1

Share this post


Link to post
Share on other sites

Some photos of progress :

 

The canal

 

post-7025-0-11262200-1366316671_thumb.jpg

 

A standard shot of the cottages

 

post-7025-0-90209500-1366316652_thumb.jpg

 

Dunno how this one got in...

 

post-7025-0-00442400-1366316664_thumb.jpg

  • Like 10

Share this post


Link to post
Share on other sites

Great stuff Stu, love the canal.

Cheers, Dave.T

  • Like 1

Share this post


Link to post
Share on other sites

Thanks Dave, still a bit more work to do on the canal yet, and the walls have come adrift underneath the bridge,,,

 

An overall shot

post-7025-0-09475400-1366317787_thumb.jpg

 

The signal box & water tower

post-7025-0-95184700-1366318139_thumb.jpg

  • Like 10

Share this post


Link to post
Share on other sites

and the walls have come adrift underneath the bridge,,,

 

It really is like the original! ;)

  • Like 4

Share this post


Link to post
Share on other sites

Very clever Stu!,

 

I see there's an industrial line, I think I might know where it leads to........

  • Like 3

Share this post


Link to post
Share on other sites

You can see to much of the cottages , surely only the chimneys should be visible ???         :jester:

  • Like 2

Share this post


Link to post
Share on other sites

I seem to think that trying  to do BCB on a corner module is pushing reality to the extreme .

  • Like 2

Share this post


Link to post
Share on other sites

Bit of a shame having the industrial line at that end Stu - as might become apparent in a week or so ;)

 

In the meanwhile some buildings start their life from the bargain bin and undergo a little modification (with some more to be done let alone the arrival of the paint brushes)

 

post-6859-0-60774100-1366365036_thumb.jpg

  • Like 6

Share this post


Link to post
Share on other sites

Unfortunately, the industrial line is now no more than a public footpath...

Share this post


Link to post
Share on other sites

How will you fit that huge building under your tunnel ?

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.