Superb work SImon and congratualtions on a successful first outing. Seeing all those flight cases brought back happy memories of an earlier life and knowing how much I spent on mine 15 years ago, I know there is an impressive investment there. Looking forward to this coming "dahn sarf".
I dont know how I missed this thread, but delighted to find it and spend a very pleasant couple of hours reading through. I love how the classic simplicity of the track plan is contrasted by the impeccable and flawless scenery that surrounds it. An absolute work of art. Thank you for sharing with us.
There is a building going up near here that is primarily OSB and polystyrene., I did spot a few bits of 4 x 2 as well. Hardly robust materials. Maybe they will skim it with bricks, but that means they are cosmetic rather than scructural.
Was good until about 19.04 this evening. Then about 30 seconds for a new page to load (blank page), but it only partly loads. (Image is pale with a "loading" box at the bottom of the page) for another 40 seconds or so. Then I got this error message.
Tesco should get their area manager down to the bridge site each day to ensure the Network Rail crew are well stocked up with sausage rolls and doughnuts. A few quid spent would do wonders for company PR.
Max does seem to be driving in the aggressive "Senna style" of putting other drivers in the position of "yield or crash".
If you do that and the other driver doesnt yield, you cant blame him if it backfires and takes you out instead.