Layout work continues. I’ve been busy ballasting, board one is almost done except for the bit right outside the tunnel, and there’s three sleepers worth of track to be ballasted on the transition board before it then becomes slab track in the tunnel itself. I’ve been doing a bit of work on the tunnel portal too, the wing walls are quite distinctive, I’ve also redone the top decorative brickwork. Compare with the photo on the first page of the thread.
Board two now has most of its platform foundations and some ballast along with all its track painted.
Andi