Jump to content
 

mozzer models

Members
  • Posts

    2,695
  • Joined

  • Last visited

Everything posted by mozzer models

  1. thank for spotting that i will have a look at it tommorow to see whats going on as i think its the photo ??
  2. Both the ex-GCR coach & GWR water wagon are now painted the next jobs are build interia for the coach then glaze plus lettering of both
  3. Japan has just issued another Quack 6.5

  4. well water tank is now in white primmer & will get a top coat of white tomorrow
  5. well in under 1 & a half hours i have this aftermoon built up the Jidenco Models kit of a GWR Dia DD1 Drinking Water Wagon well this went togetter nice & quick after punching out the rivits on the body i folded the 4 side up off the floor to form a open box then solded up the corners I then foled uo the solebars which needed 2 folds to make a channel then these & the rest of the parts are attached to the floor followed by the roof last is to fit the cact w iorns, brass & cast hatch And all done in under 1 & 1/2 hours
  6. Well got the roof on & the chassie built up plus the bogie heres some pics I still have to trim the roof ends
  7. Hi Larry Sorry i do not know what was in the range apart from the kits i have built
  8. Today i have got as far as getting the detail fitted to the sides & ends plus solderingthe side & ends togetter heres some pics
  9. Nothing to show today as i had to stay were i could hear the door But i did get the rivits pouched out on Jiidenco Models(now falcon brass) GWR Drinking Water wagon All been well tomorrow i will be gluing more bits of brass to a Ratio SR brake van B & start building a Perseverance models LNER ex- GC Suburban 8 Compartment 3rd the 50ft low elliptical roof type
  10. The Triang is in primmer & i am slowly gluing on all the small etch brass bits on to the Ratio brake van
  11. Well the Metro tank is now finished & ready for work Plus a trip to Spain What do you think ?
  12. Hi Pete the lining are HMRS transfers presfix sheet 8 I had to cut them to fit as non fitted the panels with out shorting them the cab & bunker been the worse
  13. Another update on the Metro tank well the painting & lining are finished & there is a crew on the footplate. I still have to fit screw couplings & vac pipes plus the coal in the bunker 100_4296 by mozzer36, on Flickr 100_4294 by mozzer36, on Flickr
  14. The body was given a coat of primmer followed by a coat of GWR 1906/28 green paint then today i put on the black paint Here are some pics of how she is now I still have to finish off the painting then lining & hand rails before it finished
  15. This is the 4th Deans sidings kit i have built the others at the at most 3 cuts this had 9 but with the kit are drawings & info for the cuts to the chasise use 3 datums points i strip the chassie then raped the cog left in the chassie to stop sworfe getting into it
  16. Today i have been building a Dean Sidings kit for a GWR 2-4-0 Metro tank heres what you get 1st job is to cut up the chassie so it fits the body I finished cutting up the 14xx chassie block so that the moter sits the other way up & the chassie block will fit into the body before lunch I still have one or two bits to add to the body but thay will be done after i have painted the body Well heres the pic of how she is now
  17. Mifft becouse Fotopic is down

    1. newbryford

      newbryford

      They still haven't replaced the hamsters in their wheels that power the server......

  18. Off to Rainhill for the weekend playing trains

  19. well today i have got almost all the work finished on the utility van all i have to do now is fir coupling mounts then i an make a start painting it Heres some photos of how she is now
  20. well heres the last of 3 Metropolitan Railways bogie Coach i still have 3 jubilee coaches to build hows it looking
  21. What with My C.F.S stopping work then the kids on hols i have not got much done but today i have built up the bogies for the Utility Van heres some pics of the work so far doors & hinges removed & door holes filled Doors refited Steps & extra planks added plus the corridors fitted with the bogie just sat under & not fixed in place
  22. I have taken over the admin over on CRM forum we were on netboard but of late this has been down a lot & i have moved us over to http://crmodellers.phpbbhosts.co.uk/index.php I have asked Andy Y if i can post this

  23. looking for a new Forum host as netboards is always crashing

  24. Nice work as always John
  25. Is there VAT on the Isle of Man is it not a Tax Haven
×
×
  • Create New...