I decided I would get the chassis back together so I can quickly finish this if and wen the transfers arrive. I thought for a change I would post videos as most of it is testing and running as various parts are added.
I have missed out the first operation of running after the coupling rods are connected. But start with after the connecting rods and crossheads are. I run one side before adding the second. I also at this time make sure the return crank lines up correctly.
I had a packet today. The long awaited parts from Laurie Griffin.
First up we have the Dome and whistle.
Next it is the water gauge and the vents. Only trouble is the vents are wrong the should be tubes, these are for a 2MT tender, although the packet has the right number. Back to scratch build that I wanted to avoid.
Then we have the tank stays and the chimney.
Alao in the b