Build time: about 15 hours

Days to go: 2

 

Today I shall be mostly adding the rest of the cork around the track and then base painting before the grass & ballast is added.

I still need to add the wiring and the off-stage return loop.

Link to post
Share on other sites

  • RMweb Gold

Nice baseboard supports. Don't think I've seen that done before.

 

That's going to be a bit tricky for exhibitions. I mean, how does one lift the lid to get at the ice creams....

 

 

 

Rob.

Link to post
Share on other sites

  • RMweb Gold

So, last day of modelling - what's left to do?

Finish off the grass on the embankment at the back

Finish the groundwork behind the tracks

Stick the buildings down

Grass everywhere

Ballast the tracks

Add snow

Wiring

Fascia & lighting

 

Nice to have:

Doors on the building and tunnel

Dummy point levers/frames

Steps down to below ground pump room & a set of vent pipes

Weathered NG stock

  • Like 1
Link to post
Share on other sites

  • RMweb Gold

So, last day of modelling - what's left to do?

Finish off the grass on the embankment at the back

Finish the groundwork behind the tracks

Stick the buildings down

Grass everywhere

Ballast the tracks

Add snow

Wiring

Fascia & lighting

Nice to have:

Doors on the building and tunnel

Dummy point levers/frames

Steps down to below ground pump room & a set of vent pipes

Weathered NG stock

 

Add Peckett.

  • Like 1
Link to post
Share on other sites

  • RMweb Gold

Grass at the back - done.

Ground levels behind track - done.

Ground levels at front - done.

Rails cleaned of paint - done.

Wires to rear supply point -in place.

Main building stuck down - done.

 

post-7025-0-97666400-1543586187_thumb.jpg

 

post-7025-0-79054500-1543586220_thumb.jpg

  • Like 5
Link to post
Share on other sites

  • RMweb Gold

A few more pics of the rest of today's progress (so far).

 

post-7025-0-62574000-1543586907_thumb.jpg

 

post-7025-0-54099800-1543586910_thumb.jpg

 

post-7025-0-65718600-1543586913_thumb.jpg

 

post-7025-0-75688800-1543586916_thumb.jpg

 

post-7025-0-70846200-1543586919_thumb.jpg

 

post-7025-0-96515900-1543586922_thumb.jpg

 

Yes, it looks a bit rough in places, but as we all know, a good covering of snow makes everything look much better.

Edited by Stubby47
  • Like 10
Link to post
Share on other sites

  • RMweb Gold

Ok, so not quite as much done as I'd hoped, but reasonable enough to make the layout presentable.

 

Grass and some snow added, concrete painted, fascia completed.

 

Lighting was a complete failure, the LEDs were not bright enough.

 

post-7025-0-17386900-1543622738_thumb.jpg

 

post-7025-0-77607800-1543622764_thumb.jpg

  • Like 8
  • Friendly/supportive 1
Link to post
Share on other sites

  • RMweb Gold

Build time: About 20 hours in total, some more productive than others.

 

Still to do:

Some ground areas need completing

All ballasting

Lighting

Detailing

Doors

Set dressing with munitions.

Link to post
Share on other sites

  • RMweb Gold

Still to do:

Some ground areas need completing

All ballasting

Lighting

Detailing

Doors

Set dressing with munitions.

 

Add Peckett........

  • Like 1
Link to post
Share on other sites

  • RMweb Gold

Sh*t !! Get Sentinel from loft!!

Double sh*t - SWMBO still in bed...

 

Not your fault. SWMBO should have been up ages ago to do your breakfast. You have enough on your plate.......or not in this case.....

 

 

In addition Mrs Stubbers could have bought you a Peckett.

 

Bad form all around really.

  • Like 1
Link to post
Share on other sites

  • RMweb Gold

Looking really good. I've enjoyed following this build.

 

Now all the "fill in" jobs can be done at your leisure. This is generally called "tinkering" but some serious procrastinating can ensue.

Like, adding signage that states the bl~~din' obvious. For example "No loco's past this point" next to the standard gauge drop onto the narrow gauge lines!

 

 

Kev.

  • Like 1
Link to post
Share on other sites

  • RMweb Gold

Overall, quite a successful debut.

 

I finally got the return loop working, which meant I could wander off during the quieter periods and view other layouts.

 

The transporter wagon worked most of the time, especially when no one was watching, but needs a slight tweak to the positioning and possibly a better wagon with a longer wheel base / less overhang.

 

The scenics need improving quite a lot in some areas, but this was sort-of planned for and is a further process rather than rip it up and start again. Surprisingly, the lack of a ballast wasn't noticed, until I mentioned it, but it will be added. 

 

The Nissen hut needs bedding in properly, with a little cinder path. The grass terraces at the back need finishing off, and the toilet block needs glazing and also bedding in. 

 

For lighting, I used the unit from Tinner's Forge, though a bespoke one will be added, and the facia will be clad in coloured card to improve the consistent look.

 

 

Yep, fun and pleased with how it came out.

Edited by Stubby47
  • Like 8
Link to post
Share on other sites

  • RMweb Gold

 

It must be something in the name Rob....Thank you, for your valued input...

 

(See posts #484, 492 and anything else by Sheepy...)

 

I refer the honourable gentleman to the answer I gave a few posts ago - (#497) - that exact item was on sale by KMRC and I didn't feel any urge whatsoever to pick it up , never mind purchase it.

 

I am immune.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...