Bridge 6 had been giving some concerns for a while. Materials had been on hand for some time with just a suitable window of opportunity lacking. The time presented itself over last weekend. The new structure comprises of two secondhand cast beams giving rigidity to two continuous hardwood waybeams. These are spaced by hardwood transoms and tied by threaded bar. The remains of the old structure can be seen dumped in the background..