I worked at Dover from 1981, we had 3 x 09 locos,2 in the Ferry yard and one in the Town yard.
There was a pilot changeover for each loco in turn eaxh week, usually from Tonbridge, with appropriately grumpy train crew. This changed in the late 80s once a fuelling point was built in the Town Yard.