Apologies if I've mentioned this before butone of the things which persuaded me it was
time to get out of the drawing office was
when we had some drawings made by an
outside contractor.
When I began checking them I noticed
a lot of the dimensions were missing.
Their response, when I queried this,
"The drawings are taken from 3D models,
which will also been used to create
the moulds for the parts.
You only need a few overall dimensions
and dimensions affected by the opening
and closing of the mould".
They were right of course but as someone
who was used to getting their backside
kicked for issuing drawings with missing
dimensions, I found this really hard to
accept.