Jump to content
 

Doughnut

Members
  • Posts

    736
  • Joined

  • Last visited

Everything posted by Doughnut

  1. Some more locos and units are now in action on the layout. Class 156 (Original Northern)with scratch built underframe equipment, Class 150 (Arriva Wales), Class 70 and a 9-car Pendolino. All work great, sound , lights and Motors, but the Pendo will need bringing in to the 'Works' to be souped up. Alas, I fitted some bespoke bogies and a can/flywheel motor to each driving car, but the bogie is obviously not geared for speed and it crawls slower than a class 60. Wish Id left the original motor bogies in, with traction tyres removed. But, Ive got some spare bogies in mind, which I think will speed things up nicely. Dave
  2. Arboretum doesn't do too badly in the 'drooling stakes' either. One of my inspirations! Dave
  3. Thankyou PC and Mr T. Got a class 156 going this morning...willdo some pics later. Dave
  4. Looking forward to phase 2 myself Ken. Dave
  5. You're good at this painting lark arent you! Brings it to life. Dave
  6. Very relieved Gary. Again.....like a kid in a toyshop !! Dave
  7. Many thanks Marcus..after 2 years....it does feel good!! Dave
  8. Many thanks Jinty....as for future pics...it will be my pleasure...might get some vid done as well when I try out youtube, so you can hear the sounds. Dave :danced:
  9. A new addition to Minsterley this week........................................................................TRAINS !!!!!!!!!!!! AT LAST!! After a shaky start, when I first hooked up the Lenz controller to the track and got instant short-circuit and some surgery....to locate the cause...We now have lift-off. Only a test loco not the official opening. 60007 with sound, checking all the track circuits and electro-frog points....good to GO!! Even my handbuilt cv9.25 cross-over, which I thought might give electrical probs, works perfectly. First time Ive had sound on a layout...and it is amazing! When the shortcircuit was happening yesterday,I had visions of having to lift all the points and start again But the 'Divide and conquer' method did the businesss, even though I had to cut some track with a slitting disc and some of the bus wire, to get 2 halves (easily repaired) . The cause of the misery was a bit of 3rd rail, which was touching one of the droppers on one rail, connected to another bit of 3rd rail touching another dropper on other rail...disaster!!. It was removed and has not been heard from since!!! 8) Dave First picture....Green for GO!
  10. Very nice stuff indeed! That blue NE Sand covered six plank's a gem! Dave
  11. This is what they want !!! Great idea...ballast and wallpaper roller. Dave
  12. Love the weathering and detail on these wagons Mr. S. Top stuff! (ps Hope you're 'Bigfoot' is getting better) Dave
  13. Brilliant...it really does look the business!!! (slinks off to google Carrs ash ballast suppliers. 8) ) Dave
  14. Drooling over this Sub-sector 85 Terry. A rare beast and quite a find! Top stuff. Dave
  15. Quality as usual, Mr T. May I ask, what the Road surface is made of...Im doing a few town roads soon...........and might "av it large"....so to speak with your idea? Dave
  16. Ah good old Wimpy. First and best for me! Milkshakes with the burger were highlights of the year. And of course... any place that sells Doughnuts..............well.... Are you putting a Wimpy in the new area Jaz?? Dave
  17. Many thanks. I wish I was up to the standard of scratch building a station like this Terry, but sadly it's a Faller kit of Bonn Station...but painted in the Minsterley house colours...station name printed on photopaper and interior lit with warm white LEDS. Never had it in a magazine Jaz, would be fun though..........if it works, that is??
  18. I'll have to give Rails a bell this morning. Im sure they'll have the pensioner's car at least!
  19. Cheers Ken...looks the business now with added lights and building. 2 level affair...similar to Nottingham station. All I have to do now is clean the track and I'll be able to run some trains...quite excited about it, like a kid in a toy shop. Dave
  20. At last the layout, with the exception of the Town area above the stations, is Finished!!! Lighting in Minsterley Station and the Station building installed, this week. As we approach the Witching hour I did a few nightshots to get in the mood. Next week will clean the track and run a test train. Dave
  21. No not joking...haven't tested it yet, so there may be one or two tweaks needed...maybe not? We shall see. Dave
×
×
  • Create New...