Jump to content
 

Ipswich in OO - Station, stabling point and top yard in 1985


Dagworth
 Share

Recommended Posts

  • RMweb Premium

Going back to the 309’s and the first day photos it’s interesting, and very helpful, to see that the 10 car set consisted of a re-furbished 2-car unit (605) made up to 4, while the rest are two original sets, the 621 4-car reduced to 3 and another 2-car made up to 3. 
 

Bob

Link to post
Share on other sites

  • RMweb Premium
6 hours ago, Izzy said:

Going back to the 309’s and the first day photos it’s interesting, and very helpful, to see that the 10 car set consisted of a re-furbished 2-car unit (605) made up to 4, while the rest are two original sets, the 621 4-car reduced to 3 and another 2-car made up to 3. 
 

Bob

Hi Bob

 

There was a period in the early 80s when the Clacton trains were still running as ten car while some platforms, notably Shenfield were lengthened to take twelve car trains. At the same time more hauled coaches were being modified to run within the AM9 sets and the buffets had been withdrawn. This resulted in some three car units.

  • Informative/Useful 1
Link to post
Share on other sites

  • RMweb Premium
1 minute ago, Clive Mortimore said:

Hi Bob

 

There was a period in the early 80s when the Clacton trains were still running as ten car while some platforms, notably Shenfield were lengthened to take twelve car trains. At the same time more hauled coaches were being modified to run within the AM9 sets and the buffets had been withdrawn. This resulted in some three car units.

 

Yes, thanks Clive, I've used this period to allow the production of a pre-refurb 2mm blue-grey 2-car 309 set running with either 1 or 2 extra coaches as a 3 or 4 car set, but until this shot appeared I had never seen a photo of these occurances. Shows what a wonderful resource RMweb is.

 

Bob

Link to post
Share on other sites

  • RMweb Gold

When your helix springs a leak. 
 

7B1F94B2-ECF1-4C99-9FC8-D7359868EF09.jpeg.a67b4af50fd7f6ea48ecf75da810ad73.jpeg

 

The two concrete sleeper tracks are the Norwich main lines, the wooden sleeper is the Lowestoft/Felixstowe branch. The extra track feeds into the back of what would be the London Road ballast depot so that trains shunted in there can actually disappear. There is about 20 feet of siding space before it joins the Lowestoft road so a lot of shunting won’t need to access the fiddle yard at the bottom of the helix. The track at the bottom is from the junction in the previous post and splits to the two fiddle yards, one passenger and one freight. 
 

This point is some 200 millimetres above the junction below, and two laps of the helix, about 50 feet of track distance. 
 

Andi

Edited by Dagworth
  • Like 7
Link to post
Share on other sites

On 19/12/2022 at 22:46, Dagworth said:

Not being a steam man can anyone tell me what that tender is and what would be a suitable model to start from to  build the snowplough?

 

Also what is the well wagon behind the snowplough, and what is the other wagon? I have in my head that they were ZRVs and I know that they were used for coils of steel wire.

 

Andi

Looks like the wagon could be a KRV; basically a fitted Plate, with sides removed and longitudinal baulks forming two cradles. Used to carry rod-in-coil ( https://paulbartlett.zenfolio.com/brcoilplate ) Some retained the sides and were called KEV, whilst there was a 10' wb one based on a 5-plank open

  • Thanks 1
  • Informative/Useful 1
Link to post
Share on other sites

  • RMweb Gold

East Suffolk Junction is complete, and with that all track except for the fiddle yards is now laid. 
 

328ECE0D-8591-4965-97D2-57008CBB2308.jpeg.b4885c17aece83d01d27d8da77115b8d.jpeg

This is the top of East Suffolk Junction, the line that comes from the exit of the goods yard/reception roads and links across to the East Suffolk line. 

 

 

BB4BA4E9-463E-465E-BDB4-1C05F1F57790.jpeg.c3c8f53cac26ae3e07aa096ca4860301.jpeg
And these are the crossovers that allow trains to access the Down Main to Stowmarket etc. from the yard exit. Those Peco surface mount point motors take me back about 40 years to building layouts with Hornby settrack points and their point motors. 
 

Now do I build the rest of the legs, the fiddle yard boards, or do some wiring?

 

Andi

Edited by Dagworth
  • Like 6
  • Craftsmanship/clever 2
Link to post
Share on other sites

  • RMweb Gold

A very rare situation where the lack of insulation between the two points is possible (and even desirable) 

Both points are peco code 100 electrofrog and the layout is DCC although that wouldn’t have any bearing on the wiring in this case 

 

CD1EB0E8-7766-4CF4-90E4-3F16B8EF7CDC.jpeg.f48960666d42153a7ababb2c2d18b468.jpeg

 

What is the situation? Any guesses 

 

Andi

 

 

  • Like 1
Link to post
Share on other sites

  • RMweb Gold

Part of Ipswich helix, so off scene hence the track pins, peco points, surface motors etc. 
 

69949008-37FE-4544-B7F2-6113554A0C18.jpeg.f2267a3fab83c615945de3d7008899e1.jpegThe top point in the photo is a trap point so its frog never needs to change polarity as nothing should ever go through it in normal position, there is a board joint to the right of the points which acts as the insulation for both frog rails of the lower point. If anything does cross the board joint to approach the trap when it’s not set then I want it to cause a short and bring things to a halt quickly. I could have just ignored the trap point and let short circuits acts to stop any spads but some trains down this part of the helix will be propelled so a spad may not necessarily cause a short hence the solid stop block and walls to prevent stock jumping four foot to the floor. 
 

Andi

  • Like 3
  • Craftsmanship/clever 2
Link to post
Share on other sites

  • RMweb Gold
On 14/01/2023 at 21:22, Dagworth said:

Now do I build the rest of the legs, the fiddle yard boards, or do some wiring?

I built legs, 14 sets - well I built 11 sets as I’d already built the first three - four of them are deliberately lower as four boards are deeper where the scenery goes down well below track level. 
13371379-4832-4397-B18B-C4E83F22BC1F.jpeg.da29cd41ff40a6b4e1af231f303f859f.jpeg


Now onwards to wiring, and the first thing I found was that I’d wired the DCC connection to board three with the wrong gender of multipin at each end. Short work to turn them around and then gap some sleepers (must remember to do them before wiring!) and now 47583 is happily posing in the carriage sidings with lights on. 

 

image.jpg.e40c77f8e4ae549f7201254641fe5aea.jpg
 

Andi

  • Like 9
Link to post
Share on other sites

  • 4 weeks later...
  • RMweb Gold

Apologies for the lack of progress updates, I’m busy wiring it all up at the moment so not really very much to show. 
For those strange people who like to see what goes on underneath here’s board 5 approaching wiring completion. 
 

478D4FF9-8461-40C2-8317-DCF04C0AC326.jpeg.e07fa73d5d1aa48ff29678c1af830f48.jpeg

 

This is the busiest board of the whole layout for wiring as it has five signals as well as nine points, some of the signals need ten inputs to control them. 
 

MERG servo mounts are used for point motors, with MERG servo4s to control them, the red and yellow bundle of wires go to a track circuit module of my own design, and all the veroboard pieces will go to signals eventually. The thick red and black wires at the top of the photo are the DCC buses, 6 in total for power district separation. The bus connections are still to be added, the 37pin D connections at each end carries smaller cross-board connections while the one in the middle goes to the computer control. Lots of notes of what things are written on the board itself, and all the connection details are written down (a first for me!) 

 

The big holes top and bottom are where the scenery will be below track level. 
 

Andi

  • Like 5
Link to post
Share on other sites

  • RMweb Premium
On 16/02/2023 at 15:19, Dagworth said:

Apologies for the lack of progress updates, I’m busy wiring it all up at the moment so not really very much to show. 
For those strange people who like to see what goes on underneath here’s board 5 approaching wiring completion. 
 

478D4FF9-8461-40C2-8317-DCF04C0AC326.jpeg.e07fa73d5d1aa48ff29678c1af830f48.jpeg

 

This is the busiest board of the whole layout for wiring as it has five signals as well as nine points, some of the signals need ten inputs to control them. 
 

MERG servo mounts are used for point motors, with MERG servo4s to control them, the red and yellow bundle of wires go to a track circuit module of my own design, and all the veroboard pieces will go to signals eventually. The thick red and black wires at the top of the photo are the DCC buses, 6 in total for power district separation. The bus connections are still to be added, the 37pin D connections at each end carries smaller cross-board connections while the one in the middle goes to the computer control. Lots of notes of what things are written on the board itself, and all the connection details are written down (a first for me!) 

 

The big holes top and bottom are where the scenery will be below track level. 
 

Andi

Hi Badge

 

Power Districts ?????? Us Luddites call them sections.

 

I take it it is the Norwich end of the station?

  • Like 1
Link to post
Share on other sites

  • RMweb Gold
1 minute ago, Clive Mortimore said:

Hi Badge

 

Power Districts ?????? Us Luddites call them sections.

 

I take it it is the Norwich end of the station?

It is, just north of Ancaster Road bridge. 

 

Remind me again that DCC is only two wires???

 

Andi

Link to post
Share on other sites

  • 1 month later...
  • RMweb Gold

I'm still busy with wiring (It's a long job!) so not really much to show. 

 

One of the things I've been thinking about though is communication from one end of the layout to the other (it's 60ft long!). There are TRTS switches in the fiddle yards that ask the signaller for a road out but all they do is flash an indicator on the panel that tells the signaller that something is ready to depart from the fiddle yard but not what it is. We did one show with Dagworth where we had some wired headset comms to talk to the fiddle yard but that made it very difficult to talk to people who didn't have headsets and the cables were a real nuisance to everyone inside the layout. I'm thinking that the ideal would be a wired telephone system from one end of the layout to the 'box at the other but I have no experience of wiring of telephone systems at all. I don't need any form of dialing, just something akin to signal post telephones. All the fiddle yard would have to do would be to pick up the 'phone which would light a light at the panel to indicate someone was trying to call. 

Anyone here know anything about how they are wired? Ideally it would be a couple of long lengths of cat5 cable rather than part of the layout structured cabling. 

 

Anyone able to assist?

 

Andi

Link to post
Share on other sites

  • RMweb Gold

I knocked one of the boards into another recently and damaged a section of track, Peco bullhead is quite delicate. 
D3998019-B29F-44E9-AB48-A2FF9CB60270.jpeg.64ebf623c7e3832893d29a7e8c3b9329.jpeg

 

Ten minutes later it looks like this 

83A8CC28-5DDD-4447-B15F-A918C17D0E92.jpeg.37ae1317a90164c3cbe630d4dbd66e9e.jpeg

 

That is the same piece of track, the rails cut and drawn out of the sleepers, straightened, and threaded back into the sleepers. A few damaged chairs but on this part of the yard I would’ve surprised if the real ones weren’t damaged too. 
 

I thought I’d have to lift and replace, but very happy that I could repair it instead. 
 

Other work continues with more wiring, this is the underside of board number 7 C7EE4848-EB65-45F5-95DE-FC187E3DD4CF.jpeg.07f9891b53681500f55aad94f981c5e4.jpeg

 

Onwards…

 

Andi

Edited by Dagworth
Typo
  • Like 11
Link to post
Share on other sites

  • RMweb Premium
On 23/03/2023 at 17:21, Dagworth said:

I'm still busy with wiring (It's a long job!) so not really much to show. 

 

One of the things I've been thinking about though is communication from one end of the layout to the other (it's 60ft long!). There are TRTS switches in the fiddle yards that ask the signaller for a road out but all they do is flash an indicator on the panel that tells the signaller that something is ready to depart from the fiddle yard but not what it is. We did one show with Dagworth where we had some wired headset comms to talk to the fiddle yard but that made it very difficult to talk to people who didn't have headsets and the cables were a real nuisance to everyone inside the layout. I'm thinking that the ideal would be a wired telephone system from one end of the layout to the 'box at the other but I have no experience of wiring of telephone systems at all. I don't need any form of dialing, just something akin to signal post telephones. All the fiddle yard would have to do would be to pick up the 'phone which would light a light at the panel to indicate someone was trying to call. 

Anyone here know anything about how they are wired? Ideally it would be a couple of long lengths of cat5 cable rather than part of the layout structured cabling. 

 

Anyone able to assist?

 

Andi

Have you considered SHOUTING VERY LOUDLY ?

  • Funny 4
Link to post
Share on other sites

On 23/03/2023 at 17:21, Dagworth said:

I'm still busy with wiring (It's a long job!) so not really much to show. 

 

One of the things I've been thinking about though is communication from one end of the layout to the other (it's 60ft long!). There are TRTS switches in the fiddle yards that ask the signaller for a road out but all they do is flash an indicator on the panel that tells the signaller that something is ready to depart from the fiddle yard but not what it is. We did one show with Dagworth where we had some wired headset comms to talk to the fiddle yard but that made it very difficult to talk to people who didn't have headsets and the cables were a real nuisance to everyone inside the layout. I'm thinking that the ideal would be a wired telephone system from one end of the layout to the 'box at the other but I have no experience of wiring of telephone systems at all. I don't need any form of dialing, just something akin to signal post telephones. All the fiddle yard would have to do would be to pick up the 'phone which would light a light at the panel to indicate someone was trying to call. 

Anyone here know anything about how they are wired? Ideally it would be a couple of long lengths of cat5 cable rather than part of the layout structured cabling. 

 

Anyone able to assist?

 

Andi

I can sort you out a signalbox telephone concentrator. This will allow lots of phones being able to talk to one place but not act as an exchange.

Edited by LNERGE
  • Like 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...