67A Posted September 20, 2014 Author Share Posted September 20, 2014 (edited) YES it's No!, Happy Jock! Mike, to save me writing it out again, I've posted a health bulletin in the Lounge and ERs. Off to try to kip now! Kind regards, Jock. Hi Jock, Its 'Yes' we are all Brit's and that pontificating bullyboy has spat his dummy out, what a leader he would have made. Edited September 20, 2014 by mike61680 1 Link to post Share on other sites More sharing options...
67A Posted September 20, 2014 Author Share Posted September 20, 2014 Hi Mike More great photos -posts 1316-18 I especially like the Peak on the mail train and the Class 25 from the unusual angle through the arch of the station overbridge Regards Alan Hi Alan, Thanks for that, I am trying to gain different viewpoints whilst experiencing an 'arty' moment, a very rare phenomenon I must admit. 1 Link to post Share on other sites More sharing options...
mark axlecounter Posted September 20, 2014 Share Posted September 20, 2014 Morning Mike good shots of dent. I was talking to a mobile opps manager the other day and hes was saying the signal wires went on the embankment. the only one what went on the cess was the peg at the end of the station. Hope this helps mark Link to post Share on other sites More sharing options...
RMweb Premium Ray H Posted September 20, 2014 RMweb Premium Share Posted September 20, 2014 Mike I've done it at last. You were up to page 52 when I started reading through this thread - I'm not a fast reader! It soon went to 53 pages and I've been pacing myself against that number for several days only to find this morning that you'd filled another but I've finally made it so will be watching more routinely henceforth. I have to say that it has been a brilliant story and thread - the layout's not bad either. Thanks. 3 Link to post Share on other sites More sharing options...
67A Posted September 20, 2014 Author Share Posted September 20, 2014 Morning Mike good shots of dent. I was talking to a mobile opps manager the other day and hes was saying the signal wires went on the embankment. the only one what went on the cess was the peg at the end of the station. Hope this helps mark Hi Mark, Many thanks for that, all I can say is that it was a very untidy looking set-up and I have to copy it and worse still answer all kinds of awkward questions forthcoming! Keep looking in for a little thank you of an unusual variety! 2 Link to post Share on other sites More sharing options...
67A Posted September 20, 2014 Author Share Posted September 20, 2014 Mike I've done it at last. You were up to page 52 when I started reading through this thread - I'm not a fast reader! It soon went to 53 pages and I've been pacing myself against that number for several days only to find this morning that you'd filled another but I've finally made it so will be watching more routinely henceforth. I have to say that it has been a brilliant story and thread - the layout's not bad either. Thanks. Hi Ray, Glutton for punishment then? I'll have to post more picture, much easier that that old fashioned reading idea! Glad you enjoyed your journey Ray. Link to post Share on other sites More sharing options...
hornbyandbf3fan Posted September 20, 2014 Share Posted September 20, 2014 Great pictures and what a layout. Link to post Share on other sites More sharing options...
67A Posted September 20, 2014 Author Share Posted September 20, 2014 Great pictures and what a layout. Hi Will, Thanks for joining in, its great to see a young person taking an interest in railway related matters. I can honestly tell you I have learned more through railways than I was ever taught in the true sense, keep it up young man and thanks for the comment. 2 Link to post Share on other sites More sharing options...
Andrew P Posted September 20, 2014 Share Posted September 20, 2014 Hi Will, Thanks for joining in, its great to see a young person taking an interest in railway related matters. I can honestly tell you I have learned more through railways than I was ever taught in the true sense, keep it up young man and thanks for the comment. Mike just to let you know that Will used to live in Derbyshire until last year, now he's a Pasty eating foreigner in Cornwall, hahhaha. He's also very knowledgeable and has his layout at Warley this year. Bodge. 1 Link to post Share on other sites More sharing options...
hornbyandbf3fan Posted September 20, 2014 Share Posted September 20, 2014 Mike just to let you know that Will used to live in Derbyshire until last year, now he's a Pasty eating foreigner in Cornwall, hahhaha. He's also very knowledgeable and has his layout at Warley this year. Bodge. Derbyshire, Derbyshire, Derbyshire!!! More Nottinghamshire Right about the pasties though Not so sure about knowledgeable, but my layout is at Warley surprisingly this year And no problem re the comment 5 Link to post Share on other sites More sharing options...
Andrew P Posted September 20, 2014 Share Posted September 20, 2014 Derbyshire, Derbyshire, Derbyshire!!! More Nottinghamshire Right about the pasties though Not so sure about knowledgeable, but my layout is at Warley surprisingly this year And no problem re the comment I thought Nottinghamshire was a suburb of Derbyshire. hahhah Bodge Link to post Share on other sites More sharing options...
67A Posted September 21, 2014 Author Share Posted September 21, 2014 Hi all, As promised here are a few 'unusual' shots to illustrate again the lengthy timeline an S&C based layout can enjoy... Class 45 45055 'Royal Corps of Transport' heads a Nottingham-Glasgow express over the viaduct. Swinging the camera around finds the express about to pass a Class 40 sat in the 'Up' refuge siding. Class 40 40169 is awaiting a path with a ballast working further along on the 'Up' main Both trains passing Viewed from below in the field alongside Following the movement of the Glasgow bound express... Loco's and stock courtesy of my mate Andy (Not Bodgit, another Andy, Oh its getting complicated!) Hope you like, more later.... 18 Link to post Share on other sites More sharing options...
67A Posted September 21, 2014 Author Share Posted September 21, 2014 Before anyone jumps in, yes I should have moved the Scammell and roller, Ooooopppsss! 1 Link to post Share on other sites More sharing options...
Andrew P Posted September 21, 2014 Share Posted September 21, 2014 (edited) Firstly to two timing ######,( EDIT = It didn't like the word bug ER,)I thought I was YOUR ONLY ANDY, hahhahhah. The Scammel looks great in my eyes and I think it adds depth to the shot, love it. In fact I love all the shots mate, EWS 66's next? Bodge Edited September 21, 2014 by Andrew P Link to post Share on other sites More sharing options...
Sharky Posted September 21, 2014 Share Posted September 21, 2014 2027-09-06 20.50.57.jpg Class 40 40169 is awaiting a path with a ballast working further along on the 'Up' main Geezz that Ballast Train is a bit slack. It's missed a whole section bit next to it on both lines! No but seriously It's looking great so far! 2 Link to post Share on other sites More sharing options...
67A Posted September 21, 2014 Author Share Posted September 21, 2014 Firstly to two timing ######,( EDIT = It didn't like the word bug ER,)I thought I was YOUR ONLY ANDY, hahhahhah. The Scammel looks great in my eyes and I think it adds depth to the shot, love it. In fact I love all the shots mate, EWS 66's next? Bodge No No No! No privatisation on my little bit of England! Sorry about the two timing but a man has needs. Link to post Share on other sites More sharing options...
67A Posted September 21, 2014 Author Share Posted September 21, 2014 Geezz that Ballast Train is a bit slack. It's missed a whole section bit next to it on both lines! No but seriously It's looking great so far! Hi Sharkey, Its the modern world for you, would not have happened back in the 50's! Real reason is; fettling work is still required especially on the crossing area and I'm checking on any expansion warping etc. 2 Link to post Share on other sites More sharing options...
Andrew P Posted September 21, 2014 Share Posted September 21, 2014 (edited) Off to watch the Grand Prix in a Min, and then I'll be back later for the latest pics Mike. Bodge. Edited September 21, 2014 by Andrew P Link to post Share on other sites More sharing options...
67A Posted September 21, 2014 Author Share Posted September 21, 2014 Hi all, Spent a while compiling an INDEX by which to find significant posts and progress. Here is a link to the file and it also appears on Page 1. RMWeb.Index.xlsx 5 Link to post Share on other sites More sharing options...
67A Posted September 21, 2014 Author Share Posted September 21, 2014 Sorry guys, The index is in a spreadsheet form and will not print out correctly. If I simply copy and paste all the text just follows each other and ends up as gobbledegook! Link to post Share on other sites More sharing options...
Andrew P Posted September 21, 2014 Share Posted September 21, 2014 (edited) I tried doing one for Bitton, but found I'd BITTON OFF MORE THAN I COULD CHEW, hahaha It didn't work for me when I tried your link. Bodge. Edited September 21, 2014 by Andrew P Link to post Share on other sites More sharing options...
67A Posted September 21, 2014 Author Share Posted September 21, 2014 To finish the day off here are a few more bits I have been doing... I know I said the station building was a winter project but I got tired of seeing the structure skeleton in all the photos so I have made a start on it a bit early... Started by applying some valley detail in the form of grey printed adhesive paper. Next some 0.020" plasticard is cut to shape and glued down to the roof slopes. Only reason for white and black is I ran out of black! You can see the edges touched up with some Matt Black paint prior to slates being fitted. It looks better already! However I realised I had no roof for the annex building... 6 Link to post Share on other sites More sharing options...
67A Posted September 21, 2014 Author Share Posted September 21, 2014 Last lot for this week.... a few more Blue and Grey before they disappear. Going for a lye down! 15 Link to post Share on other sites More sharing options...
Donington Road Posted September 21, 2014 Share Posted September 21, 2014 (edited) Sorry guys, The index is in a spreadsheet form and will not print out correctly. If I simply copy and paste all the text just follows each other and ends up as gobbledegook! Mike, Your Excel file needed the D column extending to cover the longest length of text. Then save your Excel file as normal, and also save your file as Text(Tab Deliminated) (*.txt). You will then have two files saved, index.xlsx and index.txt Open the index.txt file and you can then copy and paste the info into your replies here on the forum, like I have done below. I have re-attached the files here for you to download. Page Date Post No. Subject 1 16/11/2012 1 Conception and reasoning 2 17/11/2012 36 First blockwork added to rebuild the 'den' 2 17/11/2012 36 Baseboard construction design 2 22/11/2012 36 Tried Templot out! 2 25/11/2012 36 Blockwork half way - Stil trying Templot - Preparing plans on buildings etc. 2 30/11/2012 36 Started baseboards - Getting to grips? With Templot 2 02/12/2012 36 Baseboard construction - Den rebuild update 2 02/12/2012 38 Cracking photos of Dent in the 60's 3 13/12/2012 53 Templot files lost! Building structure up and awaiting roof covering 3 17/12/2012 56 Roof cover now on. Various modelling plans be redied for holidays 3 27/12/2012 62 Windows now in and building secure 3 28/12/2012 63 Baseboard construction - basic frame shown. Dummy run on station buildings 3 28/12/2012 64 More cracking photos of Dent in the 60's 4 29/12/2001 72 Rise Hill' tunnelmouth commenced 5 02/01/2013 103 David Jenkinson S&C style articles database (courtesy: IanD) 5 02/01/2013 106 Tunnelmouth completion 6 05/01/2013 136 Bracket signal prep. Viaduct thoughts! 6 27/01/2013 152 Coal Road bridge commenced 7 10/02/2013 161 Fiddleyard ideas! 7 12/02/2013 170 Roof completed! 7 20/02/2013 171 Station building window and door components arrive! 7 25/03/2013 172 Floor now finished in den 8 26/03/2013 176 1st C&L Point kits arrived 8 07/04/2013 180 "Pic's of the den rebuild to date, awaiting plastering" 8 07/04/2013 181 Mould making to make the stone walling 8 21/04/2013 186 Den plastered and painted internally 8 19/05/2013 195 Den completed and beginning the task of moving in ! 8 19/05/2013 195 Commencement of 'circular' spirals 9 25/08/2013 203 Circular' Spirals completed with track laid 9 25/08/2013 203 Layout & Fiddleyard Baseboards in position 9 25/08/2013 203 Templot track plans on F/Y and copperclad laid 9 25/08/2013 203 Templot track plans on main line with bridge in place 9 28/08/2013 212 First copperclad point constructed 9 01/09/2013 214 L/H 'Up' pointwork complete in F/Y 9 22/09/2013 221 First C&L point completed 9 22/09/2013 221 Wiring shown on L/H Fiddleyard 10 29/09/2013 228 Found out spirals were too steep!!!! 10 06/10/2013 240 Altered spiral to an elongated style and tested successfully! 11 01/11/2013 257 Full spiral tested out okay 11 01/11/2013 257 Commenced station building structure in perspex 11 03/11/2013 257 Station building basic structure complete 11 13/11/2013 270 Spiral track laying 13 01/12/2013 286 Commenced track laying on scenic section 13 27/12/2013 308 Track laying continuing with C&L slips an point kits 13 01/01/2014 321 Wiring shown on main scenic boards 14 05/01/2014 337 Control panel diagram commenced 14 15/01/2014 348 More main wiring 14 15/01/2014 348 STOVE arrives!!! 14 15/01/2014 348 Main line part ballasted and 1st 'posed' train 15 26/01/2014 370 Most main line track laid 16 02/02/2014 410 More posed shots 16 02/02/2014 411 Control panel structure completed 18 13/02/2014 435 More cracking photos of Dent in the 60's 18 15/02/2014 440 Airbrushed track prior to ballasting 18 15/02/2014 440 Control panel wiring in detail 19 23/02/2014 473 Platforms being fitted in place 19 23/02/2014 475 Coal Road bridge fitted 21 02/03/2014 501 Baseboard joints and refuge sidings ballasted 21 04/03/2014 518 "Point motors fitted to R/H fiddleyard, in detail" 22 09/03/2014 533 Point motor & general wiring on F/Y board 23 14/03/2014 557 Wiring of D-Sub connectors in detail etc. 23 18/03/2014 561 Wiring completed in order to get a line running each way 25 06/04/2014 607 Up line operational but can't upload video? 26 20/04/2014 626 Very first piece of scenic foam base fitted! Followed by platforms etc. 26 20/04/2014 626 Monkey Beck culvert fascia started 26 21/04/2014 626 Platform retaining wall fitted 26 21/04/2014 631 Culvert taking shape 26 21/04/2014 632 Bridge over approach road in place 26 27/04/2014 650 "Hillsides taking shape, platform walls fitted and painted" 27 27/04/2014 652 "First application of Mod-Roc, platform faces painted and weathered" 27 04/05/2014 663 Ground cover aplied to board 'A' 27 04/05/2014 669 Control panel wiring photos 28 11/05/2014 699 Modern Image on Dent already!!! 29 11/05/2014 702 Both platform surfaces 'gritted'. Roadway in place 29 17/05/2014 708 Station approach and car park surface done 29 17/05/2014 709 First application of GRASS made! This is just a base blend. 30 27/05/2014 740 "Scenics continuing onto Board 'B', 'C' and 'D'" 30 29/05/2014 748 "Fell's almost completed, with small viaduct to add interest to board 'D'" 31 01/06/2014 755 Fells get a coat of Base Mix grass with some 'Trains in the Landscape pic's 32 08/06/2014 792 "Change of plan at the viaduct, a new rockface terrain is being applied" 32 08/06/2014 792 Tunnelmouth construction for Board 'D' 33 12/06/2014 804 Tunnelmouth progress and first stage of the famous Snow Fences 33 15/06/2014 815 Rock face continues with riverbed detail added 33 21/06/2014 824 "Change of plan on the rockface, colour altered to grey limestone" 33 22/06/2014 834 Selection of 'staged shots' with scenic boards in position 34 29/06/2014 847 Left Hand fiddleyard track laid and board wired 34 29/06/2014 847 Some scenic detail added at the rockface and at this point I was thinking what to name it 35 06/07/2014 863 More fiddleyard wiring 35 06/07/2014 863 More control panel wiring 36 13/07/2014 878 Left fiddleyard wiring completed 36 13/07/2014 878 Right hand fiddle yard tracklaying showing details 37 26/07/2014 909 Right hand fiddle yard wiring completed 37 03/08/2014 916 Central fiddleyard boards tracklaying and wiring done 37 03/08/2014 916 First views of the whole layout assembled! 37 03/08/2014 916 First successful day of running trains!!! 37 10/08/2014 950 First views of stock assembled on fiddleyard 38 10/08/2014 951 Staged shots with several trains on view 40 12/08/2014 979 Found out that much of my stock requires re-wheeling! And some solutions 40 16/08/2014 982 Retaining wall detailing 40 16/08/2014 982 Stone walling being fitted on 'Down' side fields 40 16/08/2014 984 Another appearance of BR blue! 40 17/08/2014 992 Signal box equipment photo 40 18/08/2014 995 Wheel problem solutions 41 19/08/2014 1007 Station perimeter fencing fitted 42 22/08/2014 1026 Snow fences being erected and painted 42 22/08/2014 1026 Stone walling completed and painted on both side of the track 42 23/08/2014 1032 Gallery shots of various trains running through the scenic sections 42 23/08/2014 1035 Populated Fiddleyard views 43 24/08/2014 1056 Bufferstops made and fitted 43 24/08/2014 1057 Down' Starter fitted 44 30/08/2014 1097 Dressed up the fascia of the layout 45 31/08/2014 1102 Some scenic detail added at the Monkey Beck area 45 31/08/2014 1103 Steel fencing being made 45 31/08/2014 1103 Yard crane appears 47 06/09/2014 1163 Further scenic work carried out 47 06/09/2014 1163 Illuminated the fiddleyard! 47 06/09/2014 1163 1st application of a Static Grass mix 47 06/09/2014 1165 Snow fences now completed 47 06/09/2014 1165 1st application of scenic water in Monkey Beck 47 07/09/2014 1174 Gallery shots of various trains running through the scenic sections 51 12/09/2014 1175 1st application of scenic water in Monkey Widdale Beck. This is the name I have chosen for the south exit 52 14/09/2014 1292 Fitting of cosmetic fishplates 52 14/09/2014 1292 More water added to both beck's 52 14/09/2014 1293 Gallery shots of various trains running through the scenic sections 53 17/09/2014 1316 Gallery shots of various trains running through the scenic sections 54 21/09/2014 1337 Gallery shots of various BR Blue running through the scenic sections EDIT= Should have said, in Excel, choose Save As from the File menu to get the options of which format to save in. RMWeb.Index.xlsx RMWeb.Index.txt Edited September 21, 2014 by Donington Road 2 Link to post Share on other sites More sharing options...
Andrew P Posted September 21, 2014 Share Posted September 21, 2014 Mick, that's brilliant I'm sure Mike will be chuffed, now I need to sit and read it, and also in 6 Months time remember which page it was on. Thanks Bodge. Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now