Every piece is connected to droppers, but new layout is ply. Worked out with my big stock of SH rail, my old layout, and left over streamline I will have most of what I need, may need another 10 length of concrete.
Was going to scrap the steel in the SH track, but that can be used for the PAD as old rail.